Route A
Project route
GB/IEC-equivalent type tests, third-party pre-shipment inspection with SGS, BV or Intertek, and a factory acceptance test.
- Timeline
- 2–3 weeks
- Certificate
- GB reports in Yuete's name
- Best for
- Private and industrial projects

We do not hold CE, UL or DOE certificates. We quote one of three routes instead — and put it in writing.
Three routes
The selected route, the documents issued and the party named on the certificate are stated in the quotation.
Route A
GB/IEC-equivalent type tests, third-party pre-shipment inspection with SGS, BV or Intertek, and a factory acceptance test.
Route B
Project-specific IEC 60076 type test at a recognised laboratory, with the test programme agreed before order.
Route C
Supply from a certified partner factory holding UL / KEMA / SASO, with the certificate issued in the partner's name.
What can be sent now
The document pack is sent against a named project so the model list and reports match the equipment being quoted.
Manufacturing partner
Manufacturing partner: Guangdong Yuete Transformer Co., Ltd., based in Shishan, Nanhai, Foshan and affiliated with Guangdong Yuete Electric Power Group. Transformer operations began in 2009, with four production bases in Foshan and Jiangmen. The 35 kV / 31.5 MVA on-load tap-changing oil-immersed power transformer GB type test report was obtained in January 2026.
Manufacturing is carried out by Guangdong Yuete Transformer Co., Ltd.; LONCOTEK coordinates specification, inspection and documentation. Lead time confirmed at order.


Send the project name, rating, voltage and destination. We will state the route, the certificate holder and the documents to be issued before the order is placed.